No |
Assignment Name, Location & Scope of Assignment |
Total Built up Area |
Total Construction Cost |
Completion date |
Associated Firms |
Client |
Contractor |
|||
1. |
130 flats for the Civil Servants Housing Scheme. (Ngara Phase 1)· 4 No. 5-storey block of flats of 3 & 2-Bedroom apartments · 188 No. apartments in total · Reinforced concrete frame construction with masonry infill walls · Steel windows, timber roofs with galvanised steel sheets covering · Extensive car park · Foul and storm water drainage · Landscaping and perimeter fencing |
15,600 Square metres |
1st Contract:Kshs. 248,137,200.00
Completion contract – 169,909,101.00 |
March 2008 – September 2011 |
Architect: | Baseline Architects Ltd | Ministry of HousingP. O. Box 75323 – 00200, NAIROBI254 020 2718050
Architect Simon Opondo |
N. K. Brother LtdP. O. Box 10709 – 00400NAIROBI
Cell: 0722 811909 Email info@nkbrothers.co.ke |
||
Civil/Structural Engineer: | Armitech Consulting Engineers | |||||||||
Mechanical Engineer: | Shako & Partners | |||||||||
Electrical Engineer: | Gill Consult | |||||||||
Land Surveyor: | Geo-top Surveys Ltd |